SCOPE OF WORK COMPLETED:
● Technical inspection of a 500 m² chalet in a resort area was conducted: assessment of the condition of structural elements, engineering systems, identification of defects
● A reconstruction budget was developed based on the inspection results: scope and cost of required works were determined taking into account the specifics of the mountain resort location
● Prioritization of reconstruction works was prepared taking into account the technical condition of the facility and the client's investment expectations
RESULTS:
● The client received a substantiated and realistic reconstruction budget prior to the start of works — unexpected costs and incorrect volume estimates were eliminated
● Technical inspection of a 500 m² chalet in a resort area was conducted: assessment of the condition of structural elements, engineering systems, identification of defects
● A reconstruction budget was developed based on the inspection results: scope and cost of required works were determined taking into account the specifics of the mountain resort location
● Prioritization of reconstruction works was prepared taking into account the technical condition of the facility and the client's investment expectations
RESULTS:
● The client received a substantiated and realistic reconstruction budget prior to the start of works — unexpected costs and incorrect volume estimates were eliminated
- ● A basis for negotiations with contractors and making an investment decision regarding the facility in a resort area was provided