SCOPE OF WORK COMPLETED:
● A detailed analysis of approved design solutions, specifications, and scope of work was conducted — a complete and reliable base for calculating the planned reconstruction cost was formed
● A structured construction budget (Cost Plan) was developed with cost allocation by main line items and implementation stages: direct and indirect costs, contingency reserves
● Justification for the adopted calculated metrics was prepared — the client received a transparent methodology rather than just numbers, which ensured the ability to independently manage the budget during project execution
RESULTS:
● The client received an approved Cost Plan in an agreed format — a ready-to-use tool for cost control, interaction with contractors, and budget defense before the investor
● A substantiated cost base was formed for making management decisions at all stages of the implementation of the reconstruction of an international-standard production facility